September 12th, 2022
A message from the City Engineer regarding Ontario:
Paving was substantially completed last week, and the road is open again. There are a couple of driveway approaches that were not paved with the rest of the project, and the contractor will come back next week (week of 9/19) to pave those. Today (9/12) contractors will be conducting pressure testing of the sewer line, but disturbance to traffic will be minimal.